Sunday, August 24, 2008

More basement progress

This weekend we continued to take care of the finish work as we get very close to the end of this long, long project. While I installed the baseboard and quarter-round trim, my wife assembled a bunch of Ikea cabinets for her sewing room.
Here are some of the cabinets going together in the sewing room. The two dressers in the middle will have a large tabletop placed over the top for a large working surface.
Basement


Here's a pic of the home theater with all but a couple of small pieces of trim installed. Also shown is a large 8x10 shag rug we purchased online from NaturalAreaRugs.com
Basement


A closer shot of the rug next to the wall. We really love the color and soft feel of this rug. Definitely a bargain for the price we paid.
Basement


An even closer shot of the shag rug:
Basement


I also wired up the subpanel and started ripping out drywall under the main service panel in the garage. Next weekend I'll connect the main panel to the subpanel to finish up the electrical work. I already installed a 2-pole 40A feeder in the main service panel. The French doors I mentioned in an earlier post still need painted, as does the ugly door that leads outside. With the holiday weekend coming up augmented by a vacation day, we have a long 4-day weekend to hopefully finish up the basement and begin moving in.

No comments: